BMI2508 | Rancangan Tebatan Banjir (Sg Langat) Outlet Structure & Skin Wall Works
Bina Maju Infra Sdn Bhd was appointed by Wawasan Dengkil Sdn Bhd to execute the critical Sungai Langat Phase 2 Flood Mitigation Project (Package 2) in the Sepang District. Cooperate with the Main Contractor with our manpower and machinery to assist construct of 18nos of outlet structure and 300meter skin wall protection for sheet pile after drive.