Bina Maju Infra Sdn Bhd was appointed by WPE Engineering Sdn Bhd, the Main Contractor, to undertake the slope geotechnical and earthworks within their contract scope at UMW HVM, Serendah.
The works involved the cutting and excavation of an existing slope exceeding 10 metres in height, followed by slope stabilisation and surface protection works. Bina Maju Infra carried out the required earthworks and implemented guniting (shotcrete) works to provide a durable concrete protective layer over the treated slope, enhancing slope stability and protecting the exposed surface against erosion and weathering.